CVE 411: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM)

Work Breakdown Structure (WBS), Activity-on-Node (AON) network logic, Critical Path Method (CPM), PERT probabilistic scheduling, resource leveling, time-cost trade-offs (crashing), Earned Value Management (EVM), and construction scheduling in Primavera P6 / MS Project.

Instructor
Created by PAMCET Learning Team
advanced2 - 4 weeksEnglish

Course Overview

Work Breakdown Structure (WBS), Activity-on-Node (AON) network logic, Critical Path Method (CPM), PERT probabilistic scheduling, resource leveling, time-cost trade-offs (crashing), Earned Value Management (EVM), and construction scheduling in Primavera P6 / MS...

What You'll Learn

  • Construct multi-level Work Breakdown Structures (WBS) for complex civil infrastructure projects.
  • Compute early/late starts, early/late finishes, total float, and free float using forward and backward CPM passes.
  • Determine probability of project milestone completion using Program Evaluation and Review Technique (PERT).
  • Execute resource allocation, smoothing, and leveling across constrained labor and equipment pools.
  • Monitor construction project health, schedule variance, and cost performance using Earned Value Management (EVM).

Requirements

  • Pass in CVE 311.

Degree Programme Curriculum Context

This course is a curriculum unit of the Bachelor of Engineering (B.Eng.) in Civil Engineering degree framework in Nigeria.

Earn Your Certificate

Showcase your skills with a certificate! Complete the course, submit your project, and earn your certificate. Here's a sample of what you'll receive to show off your accomplishments.

course-certificate
Lecture Board & Syllabus

Course Curriculum

Browse complete theoretical foundations, worked calculations, laboratory protocols, and board assessment questions under each topic.

Launch Course Reader →
8 Chapters
•
16 Lecture
•
24h
Subtopic 1Document LectureOpen Access~21 min read

Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS): Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 1 • Lecture 1 Chapter 1: Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS) — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-CVE-4...

Module 1 • Subtopic 1•17,528 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS): Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 1 • Lecture 2 Chapter 1: Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS) — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Quality...

Module 1 • Subtopic 2•25,782 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 1 Assessment: Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS)

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 1: Project Planning Principles, Life-Cycle Phases, Work Breakdown Structure (WBS), and Organizational Breakdown (OBS). Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 1 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 2 • Lecture 1 Chapter 2: Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-CVE-411 &bul...

Module 2 • Subtopic 1•17,407 characters of authentic academic content
Subtopic 2Document LectureOpen Access~32 min read

Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 2 • Lecture 2 Chapter 2: Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Quality Risk M...

Module 2 • Subtopic 2•27,119 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 2 Assessment: Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 2: Network Logic Modeling: Precedence Diagramming Method (PDM), Activity-on-Node (AON), and Relationship Types. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 2 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 3 • Lecture 1 Chapter 3: Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-CVE-4...

Module 3 • Subtopic 1•17,490 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 3 • Lecture 2 Chapter 3: Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Quality...

Module 3 • Subtopic 2•25,744 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 3 Assessment: Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 3: Critical Path Method (CPM): Forward Pass, Backward Pass, Total Float, Free Float, and Critical Path Identification. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 3 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 4 • Lecture 1 Chapter 4: Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CC...

Module 4 • Subtopic 1•17,516 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 4 • Lecture 2 Chapter 4: Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FME...

Module 4 • Subtopic 2•25,761 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 4 Assessment: Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 4: Program Evaluation and Review Technique (PERT): Three-Time Estimates, Beta Distribution, and Project Completion Probability. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 4 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 5 • Lecture 1 Chapter 5: Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-CVE-411 &bu...

Module 5 • Subtopic 1•17,841 characters of authentic academic content
Subtopic 2Document LectureOpen Access~34 min read

Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 5 • Lecture 2 Chapter 5: Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Quality Risk...

Module 5 • Subtopic 2•28,278 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 5 Assessment: Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 5: Resource Management: Resource Histograms, Resource Allocation under Resource Limits, and Leveling Techniques. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 5 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 6 • Lecture 1 Chapter 6: Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-CVE-411 &bul...

Module 6 • Subtopic 1•17,450 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 6 • Lecture 2 Chapter 6: Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Quality Risk M...

Module 6 • Subtopic 2•25,711 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 6 Assessment: Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 6: Time-Cost Optimization: Normal and Crash Durations, Cost Slope, Direct/Indirect Costs, and Project Crashing. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 6 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 7 • Lecture 1 Chapter 7: Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC...

Module 7 • Subtopic 1•17,568 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 7 • Lecture 2 Chapter 7: Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs •...

Module 7 • Subtopic 2•25,810 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 7 Assessment: Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 7: Project Progress Control: Earned Value Management (EVM), Planned Value (PV), Earned Value (EV), Actual Cost (AC), CPI, and SPI. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 7 • Formative Assessment
Subtopic 1Document LectureOpen Access~21 min read

Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations: Theoretical Foundations, Continuum Mechanics & Architecture

CVE 411 • 400L • Construction Engineering Chapter 8 • Lecture 1 Chapter 8: Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations — Theoretical Foundations, Continuum Mechanics & Structural Architecture Curriculum Alignment: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM) • NUC-CCMAS-C...

Module 8 • Subtopic 1•17,650 characters of authentic academic content
Subtopic 2Document LectureOpen Access~31 min read

Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations: Applied Engineering Computation, Design & Verification

CVE 411 • 400L • Construction Engineering Chapter 8 • Lecture 2 Chapter 8: Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations — Applied Engineering Computation, Design Verification & Protocols Applied Engineering Computations • Numerical Simulation Models • Laboratory Testing SOPs • FMEA Qua...

Module 8 • Subtopic 2•25,900 characters of authentic academic content
Formative Assessment10 Points • 15 Mins

CVE 411 Ch 8 Assessment: Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations

Assessment Protocol:10 Total Points•70% Passing Threshold•15 Mins Time Limit•Bloom's Taxonomy: Analyze & Evaluate

Formative engineering mastery assessment for CVE 411 Chapter 8: Application of Construction Project Management Software: Primavera P6 and Microsoft Project Enterprise Implementations. Tests theoretical mechanisms, governing equations, and worked calculation procedures.

Module 8 • Formative Assessment

Instructor

PAMCET Learning Team

PAMCET Learning Team

Institutional Course Curation · PAMCET

The PAMCET Learning Team is the institutional curriculum and content group behind course publishing on this platform. PAMCET (Professional and Academic Management Centre for Education and Training) is operated by Digitpen Hub Ltd, a company registered in Lagos, Nigeria. Courses credited to the PAMCET Learning Team are structured, organized, and published centrally by the platform rather than authored by a single named individual instructor — each course's syllabus, learning outcomes, and content are reviewed before publication under this institutional account. For questions about a specific course or to report a content issue, please use the platform's Help & Support or Contact Us pages.

Qualifications:

PAMCET Learning Team — Institutional Course Curation, Digitpen Hub Ltd

My Skills:

  • Curriculum Curation
  • Course Content Review
  • Learning Outcome Design
  • Course Publishing & Quality Assurance
  • Platform Content Operations

Reviews

No reviews available
CVE 411: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM)
Free$24.99100% Off
Certificate available separately for $7 after completion

Course Includes

8 Chapters
16 Lectures
2 - 4 weeks
Skill Level advanced
Taught in English
Lifetime Access
Certification of Completion
Category: University - Civil Engineering
Share On

Download Syllabus & Study Guide

Receive the full lecture syllabus, reading list, and milestone schedule for CVE 411: Construction Planning, Scheduling & Project Controls (CPM/PERT/BIM).

By submitting, you agree to receive educational updates. You can unsubscribe anytime. Read our Privacy Policy.